ISO AUDIT 2021

In October 2021, we had to get our ISO 9001:2015 recertification, seeing that this is a requirement that needs to be met every 2 years. We are proud as a team to have been able to pass this Audit successfully with 0 non-Conformities. We strive to always work organized, structured and in the most effective and efficient way possible, taking care of our environment, our shareholders, and our group of employees.

Works on Pedestrian Bridge in Pos Chikito

During the month of July, preventive maintenance activities were performed at the pedestrian bridge in Pos Chikito.

The activities that were executed this year were the following:

  • Preventive Maintenance work on the Spanish Lagoon Bridge
  • Installation of New Jerseys on the Cycle path
  • Asphalt repair
  • Cleaning traffic signs
  • Asphalt cleaning
  • Pruning
  • Cleaning

Dynatest

In the month of May a Colombian company with expertise in pavement came to the Island to have some functional and structural evaluations done on the type of pavement in our project and to analyze and determine the life span of the pavement and finally be able to submit a maintenance plan to the Green Corridor.

Wacker Neuson 5055L (with Broom)

As a result of the construction phase being concluded, CIC acquired new equipment that will be required in the maintenance phase. Based on this assessment CIC purchased a Wacker loader which will help save on activities such as road cleaning, de-weeding at the median, and cleaning of the berms/verges can be performed with the same machine. The acquisition of this new machine will also enhance the safety of our personnel on the road by reducing exposure time on the roads and lowering the risk of any incident or accident involving our personnel.